产品介绍

2025年7月韩国NO.2POHAH轮完工离厂。
The repair work for Korean vessel NO.2 POHAH was finished, and the ship smoothly sailed out of the shipyard in July 2025.

2025年7月韩国NO.2POHAH轮完工离厂。
The repair work for Korean vessel NO.2 POHAH was finished, and the ship smoothly sailed out of the shipyard in July 2025.